ETABS Training
₹13,990.00 Original price was: ₹13,990.00.₹12,990.00Current price is: ₹12,990.00.
ETABS Syllabus
Course Duration: – 35-45 Hrs.
- Introduction to SAP2000, ETABS & FE Theory 2 Hrs.
- Understanding Interface
- Introduction to user friendly templates
- Co-ordinate Systems
- Finite Element Method
- Blank Window & Drawing Control Commands 3 Hrs.
- Linear and radial Replicate and Extrude
- Move, Mirror command
- Interactive database editing
- Line divide and Extend options, Edit points commands
- Frame/cable/tendon drawing control commands
- Draw command tool (Beams, Plates)
- Grid Editing 4 Hrs.
- Linear Grid Generation
- Radial Grid Generation
- Quick Commands
- Problem – G+11 Building and Water Tank Model
- Material and Sectional Property and Primary Loading Generation 4 Hrs.
- Define Material Property
- Define Sectional Property
- Define Load Patterns
- Define Load Cases
- Define Load Combinations
- G+15 Gravity Analysis
- Introduction to Selection Tool and Member Assignment 6 Hrs.
- Assign Nodal Loads, Displacement, Restraints, Springs, Masses
- Assign Member Loads, Constraints, Releases, Offsets
- Assign Plate Loads, Constraints
- Tension Compression Limits for Braces and Wall Strut
- Analysis 10 Hrs.
- Static Earthquake Analysis As per IS1893:2002, Theory of Earthquake
- Response Spectra Analysis
- Time History Analysis (International and National Earthquakes)
- Wind Analysis As per IS875(3):1987
- Push Over Analysis As per FEMA, ATC40
- Base Isolation (Rubber Isolator)
- Cable Analysis
- Pre-stressed Beam Analysis
- Design 4 Hrs.
- RCC Design
- Steel Design
- Cold Formed Design
- Miscellaneous Topics 2 Hrs.
- Report Setup
- Result Interpretation
- Display Options
- Default Settings
| Sr. No. |
Problems & Assignments, Guidance |
| 1 |
Braced Frames |
| 2 |
G+15 RCC Building |
| 3 |
Railway Over Bridge |
| 4 |
Bridge Girder with Pier |
| 5 |
Rectangular Water Tank |
| 6 |
Elevated Service Water Tank (Circular) |
| 7 |
Flat Slab/Raft Foundation |
| 8 |
Combined Footing |
| 9 |
Soil Pressure Bulb Problem/Soil Structure Interaction |
| 10 |
Mobile Tower |
| 11 |
Transmission Tower |
| 12 |
Final Project (RCC Building) |
Reviews
There are no reviews yet.