1. Basic Electrical calculations.
  2. FLC (full load current).
  3. Power factor calculations.
  4. Total connected load.
  5. Selection of motor starters
  6. Selection of switchgears.
  7. Power factor correction methods.
  1. Motor Control Centers (MCC) panels.
  2. Power Control Centers (PCC) panels.
  3. APFC Panels.
  4. AMF Panels.
  5. Power Distribution Panels.
  6. ATS Panels, etc.HVAC

a. Sizing of various compartments in panels.

b. Non compartmental panels.

c. Sizing of Cables & Cable entry.

d. Busbar Routings.

 

e. Cable terminations.

  1. (IP)Ingress Protection.
  2. Switchgear mountings.
  3. Cable supports.
  4. Busbar supports.
  1. Calculation of Weight of the panels.
  2. Powder coating process.
  3. Bending as per IP Protections.
  1. Current carrying capacity.
  2. Total weight of busbar required.
  3. Ratings of busbars.
  1. Motor starters.
  2. ATS Panels.
  3. AMF Panels etc.

a) Projects from leading Industries 

b) Internship

c) Placements Support Assistance 

Syllabus

TESTIOMONIAL ( What Our Students Says )

Limited Seats ....

0
Enrolled
0
seats Left
Days
Hours
Minutes