Sale!

ETABS Training

Original price was: ₹13,990.00.Current price is: ₹12,990.00.

ETABS Syllabus

Course Duration: – 35-45 Hrs.

  1. Introduction to SAP2000, ETABS & FE Theory 2 Hrs.
  • Understanding Interface
  • Introduction to user friendly templates
  • Co-ordinate Systems
  • Finite Element Method
  1. Blank Window & Drawing Control Commands                                     3 Hrs.
  • Linear and radial Replicate and Extrude
  • Move, Mirror command
  • Interactive database editing
  • Line divide and Extend options, Edit points commands
  • Frame/cable/tendon drawing control commands
  • Draw command tool (Beams, Plates)
  1. Grid Editing 4 Hrs.
  • Linear Grid Generation
  • Radial Grid Generation
  • Quick Commands
  • Problem – G+11 Building and Water Tank Model
  1. Material and Sectional Property and Primary Loading Generation 4 Hrs.
  • Define Material Property
  • Define Sectional Property
  • Define Load Patterns
  • Define Load Cases
  • Define Load Combinations
  • G+15 Gravity Analysis
  1. Introduction to Selection Tool and Member Assignment 6 Hrs.
  • Assign Nodal Loads, Displacement, Restraints, Springs, Masses
  • Assign Member Loads, Constraints, Releases, Offsets
  • Assign Plate Loads, Constraints
  • Tension Compression Limits for Braces and Wall Strut
  1. Analysis 10 Hrs.
  • Static Earthquake Analysis As per IS1893:2002, Theory of Earthquake
  • Response Spectra Analysis
  • Time History Analysis (International and National Earthquakes)
  • Wind Analysis As per IS875(3):1987
  • Push Over Analysis As per FEMA, ATC40
  • Base Isolation (Rubber Isolator)
  • Cable Analysis
  • Pre-stressed Beam Analysis
  1. Design 4 Hrs.
  • RCC Design
  • Steel Design
  • Cold Formed Design
  1. Miscellaneous Topics 2 Hrs.
  • Report Setup
  • Result Interpretation
  • Display Options
  • Default Settings

 

Sr. No. Problems & Assignments, Guidance
1 Braced Frames
2 G+15 RCC Building
3 Railway Over Bridge
4 Bridge Girder with Pier
5 Rectangular Water Tank
6 Elevated Service Water Tank (Circular)
7 Flat Slab/Raft Foundation
8 Combined Footing
9 Soil Pressure Bulb Problem/Soil Structure Interaction
10 Mobile Tower
11 Transmission Tower
12 Final Project (RCC Building)

 

- +

Description