Sale!
ETABS Training
₹13,990.00 ₹12,990.00
ETABS Syllabus
Course Duration: – 35-45 Hrs.
- Introduction to SAP2000, ETABS & FE Theory 2 Hrs.
- Understanding Interface
- Introduction to user friendly templates
- Co-ordinate Systems
- Finite Element Method
- Blank Window & Drawing Control Commands 3 Hrs.
- Linear and radial Replicate and Extrude
- Move, Mirror command
- Interactive database editing
- Line divide and Extend options, Edit points commands
- Frame/cable/tendon drawing control commands
- Draw command tool (Beams, Plates)
- Grid Editing 4 Hrs.
- Linear Grid Generation
- Radial Grid Generation
- Quick Commands
- Problem – G+11 Building and Water Tank Model
- Material and Sectional Property and Primary Loading Generation 4 Hrs.
- Define Material Property
- Define Sectional Property
- Define Load Patterns
- Define Load Cases
- Define Load Combinations
- G+15 Gravity Analysis
- Introduction to Selection Tool and Member Assignment 6 Hrs.
- Assign Nodal Loads, Displacement, Restraints, Springs, Masses
- Assign Member Loads, Constraints, Releases, Offsets
- Assign Plate Loads, Constraints
- Tension Compression Limits for Braces and Wall Strut
- Analysis 10 Hrs.
- Static Earthquake Analysis As per IS1893:2002, Theory of Earthquake
- Response Spectra Analysis
- Time History Analysis (International and National Earthquakes)
- Wind Analysis As per IS875(3):1987
- Push Over Analysis As per FEMA, ATC40
- Base Isolation (Rubber Isolator)
- Cable Analysis
- Pre-stressed Beam Analysis
- Design 4 Hrs.
- RCC Design
- Steel Design
- Cold Formed Design
- Miscellaneous Topics 2 Hrs.
- Report Setup
- Result Interpretation
- Display Options
- Default Settings
Sr. No. | Problems & Assignments, Guidance |
1 | Braced Frames |
2 | G+15 RCC Building |
3 | Railway Over Bridge |
4 | Bridge Girder with Pier |
5 | Rectangular Water Tank |
6 | Elevated Service Water Tank (Circular) |
7 | Flat Slab/Raft Foundation |
8 | Combined Footing |
9 | Soil Pressure Bulb Problem/Soil Structure Interaction |
10 | Mobile Tower |
11 | Transmission Tower |
12 | Final Project (RCC Building) |
Reviews
There are no reviews yet.